I have a bamboo build with 2 stages: Build&Test and Publish. The way bamboo works, if Build&Test fails, Publish is not run. This is usually the way that I want things.
However, sometimes, Build&Test will fail, but I still want Publish to run. Typically, this is a manual process where even though there is a failing test, I want to push a button so that I can just run the Publish stage.
In the past, I had two separate plans, but I want to keep them together as one. Is this possible?
Go to the stages for your plan. Select Create stage. Complete the form and select Create.
From the Atlassian help forum, here: https://answers.atlassian.com/questions/52863/how-do-i-run-just-a-single-stage-of-a-build
Short answer: no. If you want to run a stage, all prior stages have to finish successfully, sorry.
What you could do is to use the Quarantine functionality, but that involves re-running the failed job (in yet-unreleased Bamboo 4.1, you may have to press "Show more" on the build result screen to see the re-run button).
Another thing that could be helpful in such situation (but not for OP) is disabling jobs.